Abstract

This paper examines the role of TBM tail-grouting on surface settlement of coarse-grained soils in urban area. The influence of tail grouting on the ground surface settlement is firstly demonstrated through a challenging shield-driven tunnel project in Beijing City, China. FEA modelling incorporating the excavation sequence and tail grouting details is then set up to support the field observations, based on which the influences of different TBM tail-grouting parameters on ground settlement are investigated, especially the asymmetric tail-grouting in which one of the two grouting openings at the upper part of the shield tail is malfunctioned. It is shown that the grouting volume variation is inconsistent with the development of the grouting pressure, and the ground deformation in coarse-grained soils is directly related to the tail-grouting pressure rather than the grouting volume ratio. Asymmetric tail-grouting will result in notable offset of the maximum surface settlement point in settlement trough from tunnel centerline which correlates exponentially with the parameter ξ defined to represent the asymmetry ratio of the grouting pressure.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.