Abstract

This paper presents an account of two developments: the effect of EU Natura 2000 biodiversity policy on local planning and implementation processes, and a shift towards a ‘Building’ or ‘Working’ with Nature approach when designing water infrastructure projects. The account is based on a longitudinal case study of the 35‐year chronology of a flood defence project which has been implemented along the River Scheldt in Flanders. The case study data have been analysed using a chronological time series analysis. The paper concludes that ‘Building’ or ‘Working’ with Nature is resorted to both at the EU and local level, because it works to balance previously conflicting interests and is acceptable to most actors who take part in project implementation. By placing ecological goals at the start of the planning process, the authorities elsewhere in the EU could avoid conflicts of interest and speed up project implementation in Natura 2000 estuaries.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.