Abstract

ABSTRACTIn this paper, we reflect on the effectiveness of environmental assessment (EA for e.g. projects, policies, plans and programmes) in Iranian water management. Urmia Lake Basin (ULB) is used as a case study area and the extent to which EA appears to be delivering environmental protection objectives is established. Data were collected using document analyses, semi-structured interviews with local experts and site visits. It is established that activities are restricted to project level EIA (environmental impact assessment) and that EA is not able to address and mitigate the negative effects of extensive water exploitation through dam- and well building. Strengthening EIA legislation as well as introducing SEA is suggested as a possible way to address shortcomings, in particular with regard to addressing cumulative and wider basin effects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.