Abstract It is a recognized fact that the lack of public and political support is one of the main sources of delay in building new transmission lines. In an energy era where there is an increasing lag between transmission grid development and the rapid generation growth, it is essential to streamline the related transmission line approval procedures. There is a strong relationship between stakeholder engagement on one side, and acceptance and support on the other side. The aim of the paper is to investigate ways of fostering acceptance of transmission lines through participation by analyzing in detail the case of a disputed France–Spain interconnection project. We argue that participatory processes should embrace not only an instrumental rationale, but also normative and substantive rationales. Based on literature and the case study, we analyze this important condition for effective participation in transmission planning procedures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.