Abstract
In a context where anaerobic digestion is a controversial subject, it is not surprising to see that between 20% and 30% of anaerobic digestion projects are abandoned, mainly for reasons of local opposition, problems of coordination between stakeholders and the implementation of real territorial governance capable of facing the challenges encountered during the setting up of the project. We can consequently question the role that local territorial authorities could play to encourage the development of biogas in France. We used semi-structured interviews conducted with anaerobic digestion stakeholders to identify the main functions of territorial intermediation (and their specific elements) that local authorities could have to encourage the deployment and success of these projects. Local authorities play the role of intermediation by (i) ensuring spatial and cognitive proximities between actors, (ii) mobilizing territorial resources and favoring local anchorage (iii) installing trust among the local stakeholders and (iv) having a role of instigator by participating in the supply (inputs) of biogas plants and the purchase of the energy produced (outputs).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.