Abstract

In this paper, a continuous time Markov chain model is introduced to study multi-product manufacturing systems with sequence-dependent setup times and finite buffers under seven scheduling policies, i.e., cyclic, shortest queue, shortest processing time, shortest overall time (including setup time and processing times), longest queue, longest processing time, and longest overall time. In manufacturing environments, optimal solution may not be applicable due to uncertainty and variation in system parameters. Therefore, in this paper, in addition to comparing the system throughput under different policies, we introduce the notion of robustness of scheduling policies. Specifically, a policy that can deliver good and stable performance resilient to variations in system parameters (such as buffer sizes, processing rates, and setup times) is viewed as a “robust” policy. Numerical studies indicate that the cyclic and longest queue policies exhibit robustness in subject to parameter changes. This could provide production engineers a guideline in operation management.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.