Abstract
ABSTRACTEconomic statistical designs aim at minimizing the cost of process monitoring when a specific scenario or a set of estimated process and cost parameters is given. But, in practice the process may be affected by more than one scenario which may lead to severe cost penalties if the wrong design is used. Here, we investigate the robust economic statistical design (RESD) of the T2 chart in an attempt to reduce these cost penalties when there are multiple scenarios. Our method is to employ the genetic algorithm (GA) optimization method to minimize the total expected monitoring cost across all distinct scenarios. We illustrate the effectiveness of the method using two numerical examples. Simulation studies indicate that robust economic statistical designs should be encouraged in practice.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.