Abstract

Risk criterion is a term that may distinguish between what is considered as an acceptable level of safety and what is not. One of the ways of determining quantitative risk criteria for temporary changes in a nuclear power plant considering probabilistic safety assessment is presented. Risk criteria are based on timing and on time duration of the change. Several examples of temporary changes in a nuclear power plant were examined to evaluate the criteria. Results show that it is possible to determine a set of risk criteria for temporary changes. Risk criteria can represent a standpoint for risk-informed decision making.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.