Abstract

This paper introduces an enhanced energy auditing process including a ring-fencing mechanism for the selection of energy efficiency measures considering a multi-stage planning of the energy retrofitting project. The proposed ring-fencing approach enables SMEs to overcome the barrier of lack of capital for the implementation of energy efficiency measures by implementing first no-cost measures and only after that energy savings are accumulated considering the installation of low-cost, medium-cost and finally high-cost measures. The advantages of the proposed methodology are illustrated by means of three case studies, where a variety of energy efficiency measures were first identified throughout the auditing process involving three different SMEs, then most effective measures were selected and scheduled to be implemented according to a multi-annual plan while considering budget and operational constraints. The results of the pilot studies show that the business owners have improved their decision-making with respect to energy efficiency upgrades by engaging in the auditing process and accepting the recommendations about the suggested interventions to maximize financial (and environmental) benefits.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.