Traditionally, pile load tests in Kazakhstan are carried out using static and dynamic load test methods. Static pile load test is the most reliable method to obtain the load-settlement relation of piles. Most of the static pile load tests are performed using reaction systems. Furthermore, cost and time for the static pile load test are relatively high compared to the dynamic pile load testing. Therefore, the number of pile load tests in construction site is limited to 2 or 5 piles in usual of constructed piles In Kazakhstan. This paper includes the short summary about dynamic and static tests by driven piles (cross-section 30×30 cm and length of 12 m). The methodologies of definition bearing capacity of the pile by aforementioned methods were also given. As an example for those methods, paper describes the results of the dynamic, traditional static and the new PDA (Pile Dynamic Analyzer) tests of cooperative work of soils and piles performed in the construction site of the New Railway Station in Astana. According to the results of tests were determined the possible depth of penetration and bearing capacity of piles, as well as recommendations on the device of working. The construction is part of the preparations for EXPO 2017. It will be 11 times bigger than the existing railway station. The height of the six-floor complex will be 49.5 metres, the width 116 metres and the length 630 metres.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call