Abstract

Large industrial energy consumers served at transmission voltage in the ERCOT market reduce their consumption up to 4% during intervals in which consumers are charged for transmission services. The response normally lasts two to three hours, since consumers do not know exactly which interval will set one of the four summer coincident peaks (CPs), which are the basis for transmission charges. Thus, the design of transmission prices in ERCOT has been successful in eliciting demand response from that market's largest industrial energy consumers. However, there is no noticeable response during some CPs, reflecting the difficulties in predicting the actual timing of the peak. The response by industrials served at primary voltage to the price signals is insignificant.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.