Abstract

Based on the relative theories of the engineering project management sand table experiment and engineering project control, this paper uses the sand table experiment to simulate the project of century bridge from the aspects of the formulation of the construction scheme and the planning, the purchase method of the materials, the arrangements of the construction teams and the financing methods, integrating the theory of the earned value and the analyzing software to carry out the cost control and the optimization, finding out the factors of the engineering project control to obtain the optimal plan.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.