Abstract

In smart substation, transmission line longitudinal protection debugging cannot take place, before the line communication channels construction, that cause it often occur that not fully debug, choose a suitable time for debugging in advance. In this paper, based on the analysis of the longitudinal protection debugging process, combining with the computer technology, and 3G/4G communication technology, design a set of intelligent substation EHV-line longitudinal protection device of temporary channels. Ensure, in intelligent substation, carry out advanced debugging, select the appropriate time debugging, debugging completely, before the longitudinal channel built, and establish a reliable foundation for the normal operation of the longitudinal protection equipment.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.