Abstract
According to retaining walls of joint construction buildings and office building of the mine of three yuan weizi town, outdoor pavement reinforcement of engineering practice, introduced the design parameters and construction process of the high-pressure jet grouting pile, soil nail wall and drilling grouting, the results showed that reinforcement scheme is reasonable and feasible, there is reference to other similar projects.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.