Abstract

The western South-eight block which is located in the comprehensive tap demonstration area of NO.2 oil production plant, has already gone through three years’ fine development. The production has been stable, the rising amplitude of comprehensive water cut has been small, and the natural decline rate has been controlled effectively. But with the deep development, this block has gone into the late ultra-high water cut stage. To maintain high efficient water flooding development is more and more difficult, therefore fine 3D geological modeling and reservoir numerical simulation work have been carried out. And some practical residual oil saturation diagrams have been put forward finally towards this block, which has provided a reliable basis for the next oilfield development.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.