Abstract

As to shield tunneling, that soil is reinforced into the void is one of the most important reasons which cause the ground settlement, and always most important factor in the tunnel construction and the relative research. The numerical simulation studies presented in this paper focus on the different grouting pressure causing different ground settlement, plastic area and stress growth behavior. Based on the simulation results and the engineering ground settlement limit, propose reasonable synchronous slurry injection pressure and the relative method of controlling ground settlement. Propose reasonable suggestion for the determination of grouting pressure during shield construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.