Abstract

Double Circuit Steel Tube Tower has a large size structural and a heavy weight of components, so the construction of tower becomes more difficult. This article uses the Midas software to simulate the Process of Inside Pulling Wire for Double Circuit Steel Tube Tower erection in windy weather and no windy weather, Researching the influence of the new lifting system and the original lifting system on the whole of lifting system. Through the stress analysis and simulation formajor rigging, we can know which lifting ways can be used when the horizontal displacement of the derrick has or has not strict restrictions, or the lifting weight has been restricted when the Wind load is too strong. New lifting system can lift very heavy tower material and has little affect by windy weather, especially suite for assembling large size structural and heavy weight of components tower.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.