Abstract

The Fukushima nuclear disaster has raised the focus on the reliability and risk evaluation of the spent fuel pool (SFP), especially the fire risk. From a safety point of view, the low decay heat of the spent fuel assemblies and large water inventory may make the accident progress very slow, but a large number of fuel assemblies stored inside the pool and without containment above the SFP building might bring greater risk. For pressurized water reactor HPR1000 nuclear power plant, the reliability and risk of spent fuel pool under internal fire is assessed. The fire probabilistic safety analysis method is used to assess the reliability and risk of spent fuel pool under internal fire. Through quantitative analysis, we can know more about which aspects play a leading role in the internal fire risk contribution.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call