Abstract
The safety injection system (RIS)is a large and complex fluid system in a nuclear power plant. Its central role is to ensure the safety of the core in the event of a breach event in the first circuit of the nuclear power plant. In order to investigate the timing of the safe injection system at the time of a Small-Break Loss-Of-Coolant Accident (SBLOCA), this paper uses the GO-FLOW method to model seven time points in the three operational phases of the safe injection system. The calculation is completed in conjunction with the failure rate of each component to give the reliability of the RIS at each point in time at SBLOCA. The final analysis yielded low reliability at the beginning of the direct cold section injection phase, which is of great reference for subsequent equipment maintenance and the safe operation of nuclear power.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.