Abstract

Many studies reveal the positive impact of practices use on overall project performance, resulting in a consensus opinion in the industry that implementation of certain practices leads to improvement; yet there have been no definitive studies reporting in a quantitative manner, the relative impact of practices on different project objectives. This study develops models using multiple descriptive discriminant function analyses that divide project cost and schedule performance into four different performance groups. The study then examines the practices that discriminate among these four groups. Finally these results are summarized into a practice use index categorization for project cost and schedule performance. Critical practices indicating dominant impact on both cost and schedule performance are pre‐project planning, project change management and design/information technology practice. Team building practice is a cost‐beneficial practice and zero accident techniques practice is a schedule‐beneficial practice, while constructability practice has a balanced bottom line impact on both cost and schedule.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.