Abstract
The paper considers the application of creative problem-solving (CPS) principles to the reduction of plant maintenance costs. A brief description of CPS principles and methods is first given. Three case studies are then described that illustrate the use of CPS on problems at plant and machine levels, by different group compositions and on problems of different types. A review of experience of the use of CPS methods by maintenance engineers trained in their use is also given. It is concluded that CPS is a valuable approach that may be used effectively to identify causes of maintenance problems and to find solutions to particular problems of diverse kinds that incur maintenance costs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Proceedings of the Institution of Mechanical Engineers, Part E: Journal of Process Mechanical Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.