Abstract

During the 13th Five-Year Plan period, the rapid growth of air traffic flow, so that the air traffic control industry is facing great pressure. The contradiction between flight flow support capability and airspace capacity is increasingly prominent, North China is under increasing pressure to secure flights. The existing air traffic control service as the core of the operation management mode is no longer competent. A relatively independent, professional and systematic flow management system covering all aspects of flight operation is an inevitable requirement to ensure the safe, orderly and efficient operation of large-scale air transport system. From the perspective of flow management system construction, this paper expounds the construction background, construction content and technical innovation direction of the project. Air traffic control departments make full use of new technologies, new equipment and new control means to continuously tap the control potential and improve the comprehensive support capacity of air traffic control through scientific methods.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call