Abstract

The superconducting tokamak project HT-7U, aiming at steady-state advanced operation mode, will make a contribution to future steady-state tokamak reactors. The scientific and the engineering missions of the project are to study physics issues of the steady-state tokamak operation and to establish technology basis of full superconducting tokamaks. It features: superconducting toroidal field system and poloidal field system, non-inductive current drive and plasma heating systems, flexibility and reliability of plasma shaping control, J(r) and P(r) control, replaceability of plasma facing components and divertors for power and particle handling study in steady-state operation and advanced diagnostic measurements. The physics design and the engineering design have been completed essentially. The key R&D programs of the tokamak device have been successful. The assembly of the device has begun. It is planned to obtain the first plasma in 2005.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.