Abstract

The paper presents the results of analyzing switching overvoltages occurring with simultaneous shedding of active inductive load by vacuum breakers jointly connected to one bus. It is established that with the available spread in current choppings of vacuum breakers, the maximum overvoltage occurs on the contacts of a vacuum breaker out of the number of parallel connected ones, in which the gap is de-ionized last. It is recommended to damp any occurring overvoltages by arresters located in parallel to separate groups of breakers connected to one bus.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.