Abstract

To what degree are recently built and planned power plants in the EU ‘capture-ready’ for carbon capture and storage (CCS)? Survey results show that most recently built fossil fuel power plants have not been designed as capture-ready. For 20 planned coal-fired plants, 13 were said to be capture-ready (65%). For 31 planned gas-fired power plants, only 2 were indicated to be capture-ready (6%). Recently built or planned power plants are expected to cover a large share of fossil fuel capacity by 2030 and thereby have a large impact on the possibility to implement CCS after 2020. It is estimated that around 15–30% of fossil fuel capacity by 2030 can be capture-ready or have CO2 capture implemented from the start. If CCS is implemented at these plants, 14–28% of baseline CO2 emissions from fossil fuel power generation in 2030 could be mitigated, equivalent to 220–410 MtCO2. A key reason indicated by utilities for building a capture-ready plant is (expected) national or EU policies. In addition, financial incentives and expected high CO2 prices are important. The implementation of a long-term regulatory framework for CCS with clear definitions of ‘capture- readiness’ and policy requirements will be important challenges.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.