Abstract
This research studies the impact of maximum allowable stopping time for machining tools on the production-inventory policy under a variable tools lifespan and demand. A mathematical model is developed to determine the optimal maximal allowing stopping time, the inventory level, and the replenishment interval. A numerical example was conducted using an exhaustive searching method to show the implementation of our model. The results indicate that, compared to the traditional policy which only repairs and replace the broken tools, adopting a maximum allowable stopping time dramatically reduced the total production cost.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.