Abstract

AbstractThe paper describes contractual procedures necessary when performance guarantees are required for process plant. It shows how the Institution of Chemical Engineers Model Form of Conditions of Contract for Process Plants (Red Book) can be suitably modified to meet the needs of the water industry.Particular attention is given to devising suitable testing regimes to meet the contract stages – construction, completion, take‐over, and performance tests. The principles underlying the proposed testing procedures are stated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.