Abstract

The key process of industrial and civil building construction aim at good engineering quality management. Excellent construction project cannot be separated from the efficient quality management control. The construction environment become more complex and difficult because of the requirement of improved construction quality from people. Therefore, thequality management of construction site appear to be particularly important, and we should actively take effective measures to solve the arisenproblems during the whole process. the selection of related personnel, professions, personnel education and training. After winning the bid for the project, the selection of personnel should be implemented according to the realistic status, then set up the relevant departments and perform reasonable job assignments according to the individual's professional skills. Management of construction materials.We must make sure the quality of construction materials is good so that the quality of the project can be toassured.We must control the quality of construction materials throughout the entire project process. We need to control the purchase of raw materials,select the most appropriate supply of raw materials manufacturers by a series of contrast,so that the purchase effect canreach the best and cheapest one. At the same time, the transportation and management of raw materials should be further strengthened in the delivery and management,avoiding the damage. Management of construction equipment.From now on, large machinery and equipment are widely used in the building operations because of the improvedmechanization level. Therefore, we need to focus on the construction quality management of construction equipment management site. We need to implement the actual situation of the project constructionto schedule, construction machinery allocation, in order to ensure the construction at the same time pay attention to saving the project cost. The state of construction machinery and equipment in this process need to be good mastered, in order to avoid safety hazard in the whole construction process.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call