Abstract

During the construction of Tongluoshan Tunnel of the 6th light rail line in Chongqing, collapse of goaf of colliery area occurred which affects the construction and permanent safety heavily. Advanced geological prediction were done with ground penetrating radar to probe the goaf’s location, scale and characters of underground water and filling articles, then countermeasures such as advanced pipe roof supporting, goaf stowing, wall rock and filling articles’ voids grouting was applied;after that,supporting plan was adjusted to ensure construction safety with the data from monitoring whose result proves the availability of above prediction technology and countermeasures to similar goaf.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.