Abstract

In the province of Agrigento (Sicily), owing to lack of funds, machinery and permanently employed workers, it is necessary to forecast costs and time required for thinning out about 1500 ha of artificial forest using only chain saws and temporarily employed manpower.This study was made to find out how costs and labour productivity vary with tree species, age, size, forest density, land orography and ground uneveness, in order to decide in which areas the change from artificial to natural forest, by gradually thinning out the non-autochthonous trees, could be done at the least cost. Logging processes have been monitored at nine different test sites of about 1 ha each.The results show that labour productivity and consequently costs are increased by the unevenness of the ground and its gradient, but only slightly increased by tree density and size. The presence of species with a low number of branches or of trees of relatively young age (<20 years), increases labour productivity and decreases the logging costs.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.