Abstract

Earth Pressure Balance shield machines are used to construct metro tunnel in Shenzhen mixed ground. The ground condition is full of water and the diversity of two grounds in juncture is drastic. The risk mechanism of this ground is studied, and the main risks are found out. The main risks are assessed and classified employing the method of P=R×C, then the risk classification is determined. These studies ensure the projects in Shenzhen metro advance successfully.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.