Abstract

Solar One, the 10 MWe Solar Thermal Central Receiver Pilot Plant near Barstow, Calif., completed a three-year period of power production testing in July 1987. During this period the plant’s capacity factor, system efficiency, and availability were studied to assess the operational capability of Solar One to reliably supply electrical power. The long-term performance of key plant components, such as the heliostats and the receiver, was also studied. During the three years of power production operation, Solar One achieved increases in capacity factor, system efficiency, and availability. Heliostat operation was reliable, and only small amounts of mirror corrosion were observed. Receiver tube leaks did occur, however, and were the main cause of the plant’s unscheduled outages. Solar One provided valuable lessons which will aid in the design of future solar central receiver plants.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.