Abstract

Development of TOD is done partially in Bandung Metropolitan Area. The transportation system development plans and the spatial plans are not the basis of TOD development. The research problem in this study is the prerequisite of TOD which is still not clearly identified, many transportation plans that exist, as well as the existing plans that have not yet determined the location points of TOD. Therefore, this study aims to identify some locations which have potential and opportunity as TOD in Bandung Metropolitan Area. The research approach is a qualitative approach, consisting of descriptive approach and prescriptive approach. The result of this study reveals that there are several locations having potential and opportunity as TOD, but there are some constraints on the location. There is a location that has been planned as a TOD area, but it does not meet the development prerequisites of TOD. In addition, there are several locations that have opportunity to be developed as TOD, but some have conditional directives.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.