Abstract
The potential of electricity load management within the industrial sector in Jordan is assessed and quantified. Different load management options that would result in reducing the maximum demand on electricity by the industrial sector were considered. The potential for reducing the peak load of the Jordan electrical power system by load management within the industrial sector (medium industrial plants) is estimated to be 22.2 MW.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.