Abstract

Modern approaches to construction of utility lines are reviewed. The hole-making technology of pipe driving can be improved by introduction of concurrent removal of soil plug by batches, which essentially enhances performance efficiency. The minimum air pressure required to separate batches from soil plug and to move it along a pipe is determined. The feasibility of cyclic destruction and removal of soil plug during pipe ramming is experimentally proved.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.