Abstract

Abstract Drilling across two sections (10,000-ft laterals) in a horizontal well in the Middle Bakken formation of North Dakota offers challenges and opportunities for improved well-construction performance. The wells in this area were drilled with three different hole sections after setting the 16-in. conductor at 60 ft. The first hole section was drilled 13 ½-in. vertical hole with fresh mud to the 9 #x215D;-in. casing set at +/− 2,000 ft and cemented to the surface. The second hole section was drilled 8 ¾-in. vertical hole with oil-based mud and built the curve to the 7-in. casing set at +/− 11,000 ft and cemented to a point above the Dakota formation. The curve was built at a 12 to 14° BUR to a landing point in the Middle Bakken target zone at approximately 90°. The last interval drilled was a 6-in. lateral-hole section, geosteering with mud motors, using two different bend settings of 1.15° ABH and 1.5° ABH. Wellbore stability in the Middle Bakken is not an issue when using a cut brine-produced fluid. Most of the wells were completed by installing 4 ½-in. liner with swell packers and ball-actuated stimulation ports without cementation. The lesson learned on three offset wells in this area found that a bend setting of 1.15° has contributed to reduce tortuous well paths, controlled dogleg severity, and stayed in a very tight target interval while drilling the lateral section of 10,000 ft along the hole. The reduced spiraling saved countless hours of reaming requirements and allowed the Swellpacker→ liners to be run to TD without significant working. Drillstrings, bottomhole assembly (BHA), bits, the length of the lateral section of horizontal and drilling fluid were all considered.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call