Abstract
Development of a new modern housing areas has demand a retention pond for recreation activity and landscaping purposes. This study deals with the evaluation of water retain ability of a new retention pond from the soil condition perspective. Geotechnical laboratory testing was performed via particle size distribution, Atterberg limits and permeability to assess the retention pond soil condition. All the experiment was performed according to British Standard 1377 (1990). It was found that soil tested has been dominated by fine particles which ranged at 30.84 – 60.88 % compared to the coarse particles (sand and gravel). Atterberg limits results has found that all soil tested has a liquid limit (LL), plastic limit (PL) and plasticity index (PI) that was varied at 29 – 74 %, 16.9 – 33.6 % and 17 – 40.4 % respectively representing its promising water retain capability. Moreover, permeability result founds that all values of permeability coefficient, k was ranged at 3.11 x 10-4 – 5.65 x 10-7 cm/s thus conclude that all soil tested has low to very low degree of permeability. Finally, retention pond of a new development area has been evaluated directly according to its soil condition thus provide some valuable information to the responsible parties regarding the future planning and decision making of the sustainable catchment areas.
Highlights
Development of infrastructure in modern housing area consist of comprehensive system of transportation, water, sewerage, communication and electrical
The Atterberg limits are a basic measure of the critical water contents of a fine-grained soil: its shrinkage limit, plastic limit, and liquid limit
Atterberg limits performed in this project consists of liquid and plastic limit
Summary
Development of infrastructure in modern housing area consist of comprehensive system of transportation, water, sewerage, communication and electrical. Those task was crucial for civil engineers due to the application of science and technology together with wisdom and experience to design, construct, maintain and manage the infrastructure in line with the current human civilization development. Retention pond is one of the main component constructed in a new developed housing areas. Retention pond may constructed by concrete or original earth materials. New earth retention pond may experience uncertainties regarding its water retain capability. Pond liner need to be installed if the earth material composed of highly permeable soil. Assessment of retention pond water retain ability need to be properly introduce before any further decision making regarding the necessity of the pond linear application
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Engineering & Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.