Abstract

An overall shifting device was designed to move the drill as a whole, avoid the repeated assembly and disassembly of the cluster wells drill. The hydraulic system of the device and the strength of the loaded parts of the system was checked; The earth anchor, the size of the earth anchor was determined and ANSYS analysis were conducted to ensure its supporting function.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.