Abstract

In order to comprehensively control south second underground mine of Liziya and accident-prone gas outburst, low coal seam permeability coefficient, disaster caused by outburst and following prevention with and high cost and so on, the targeted outburst prevention optimization measures in coal roadway excavation area is puts forward, by applying independently developed " drilling and slotting integration " hydraulic slotting equipment in the process of drilling construction, making coal seam of pre-drainage area carry on antireflection, exposure area of drilling in coal is increased, achieve the purpose of increasing coal seam permeability and drilling extraction radius, improve extraction effect and shorten reaching standard time of gas extraction, provide a more complete solution for outburst prevention measures of underground area in mine.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.