Abstract

Concrete mixing station location occupies a very important position in the supply chain of the commercial concrete, location not only affects the cost, but the level of quality of concrete delivery service. In view of the traditonal location model only pursuing the cost minimization and neglecting serive level, the reliability is introduced into location model as a standard of concrete delivery service, to establish a multi-objective model which uses the cost minimization and reliability maximization as the objective function. Finally, the effectiveness of the model was confirmed by a numerical example.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call