Abstract
This work focused on the insufficient or excessive pressure relief in large-diameter pressure relief by drilling. The influence of large-diameter pressure relief by drilling on the 6307 working face of the Tangkou coal mine on the roadway deformation was taken as the research background, with numerical simulations, indoor experiments, and on-site applications used. The influence of pressure relief drilling on roadway deformation was studied to propose segmented reaming pressure relief. The influences of parameters (e.g., reaming diameter, reaming depth, and borehole spacings) on the evolution characteristics of segmented reaming cracks and pressure relief were further investigated. The results showed that segmented reaming pressure relief reduced the roadway deformation and the peak elastic energy of coal in the impacted hazard area and improved the energy accumulation of the surrounding rocks of the roadway. The effect of segmented reaming pressure relief was positively correlated with the diameter and length of the reaming section; it was negatively correlated with borehole spacings. The optimized segmented reaming parameters of the 6307 working surface of Tangkou coal mine are as follows: the optimized reaming diameter of 240 mm, the reaming section depth of 15 m, and the borehole spacing of 1.6 m. Field tests proved that the optimized segmented reaming technology can improve the deformation of the surrounding rocks of the roadway and construction.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.