Abstract

Riprap concrete technology is the effective measures to control the temperature cracks in construction of mass concrete. But in the implementation process, there are some problems. In this paper, riprap concrete technology problems of the actual implementation are proposed, and the optimal solution is given. At last, relation to Dinghan gardens project raft foundation of mass concrete works, the material mix proportion is described in the paper. At the same time, construction technologies are outlined including pouring by segmentation and layer, riprap technology, bleeding treatment and concrete maintenance. The construction strength is tested by comparison test of normal maintenance. The results present that it not only solve construction problems of mass concrete in summer, but also shorten construction period and decrease construction cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.