Abstract

As supply chain finance developed, more and more enterprises in manufacturing industry can have better payment terms with their cooperator. This paper consider the decision of the optimal trade credit term and production lot sizes considering shortage cost in manufacturing industry. We build a model with which we can prove that there exist the optimal trade credit term and production lot sizes for enterprises in manufacturing industry.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.