Abstract

As supply chain finance developed, more and more enterprises in manufacturing industry can have better payment terms with their cooperator. This paper consider the decision of the optimal trade credit term and production lot sizes considering shortage cost in manufacturing industry. We build a model with which we can prove that there exist the optimal trade credit term and production lot sizes for enterprises in manufacturing industry.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call