Abstract

This paper presents the mixed integer linear programming based model for determining optimal number, type and location of remotely controlled and supervised devices in distribution networks in the presence of distributed generators. The proposed model takes into consideration a number of different devices simultaneously (remotely controlled circuit breakers/reclosers, sectionalizing switches, remotely supervised and local fault passage indicators) along with the following: expected outage cost to consumers and producers due to momentary and long-term interruptions, automated device expenses (capital investment, installation, and annual operation and maintenance costs), number and expenses of crews involved in the isolation and restoration process. Furthermore, the other possible benefits of each of automated device are also taken into account (e.g., benefits due to decreasing the cost of switching operations in normal conditions). The obtained numerical results emphasize the importance of consideration of different types of automation devices simultaneously. They also show that the proposed approach have a potential to improve the process of determining of the best automation strategy in real life distribution networks.

Highlights

  • Cena kratkotrajnog prekida za generator dg na fideru f, CCAPU( j,k, f ) - cena kratkotrajnog prekida za opterećenje tipa k u čvoru j na fideru f, s=(si,sj) – skup čvorova u mreži između kvara i i čvora j u kojima je moguće ugraditi reklozer

  • They show that the proposed approach have a potential to improve the process of determining of the best automation strategy in real life distribution networks

Read more

Summary

NS f

U objektivnoj funkciji (1) su korišćene sledeće oznake:. T – period razmatranja, d – intersna (diskontna) stopa, p – stopa rasta opterećenja, pdg – stopa rasta proizvodnje DG, Nf - broj fidera u razmatranoj mreži, NCf – broj grana (deonica) na razmatranom fideru f; smatra se da je transformatorska stanica (TS) jedna grana koja ima jediničnu dužinu sa odgovarajućim intenzitetom otkaza, NLf – broj potrošačkih/generatorskih čvorova na razmatranom fideru f, NDGf – broj čvorova u kojima se nalaze DG na fideru f, CLj – komponente (tipovi) opterećenja u čvoru j, kvar (i, f ) - intenzitet trajnih otkaza grane [broj trajnih kvarova/god./km] i na fideru f; kod TS ovaj parametar je dat kao [broj trajnih kvarova/god.]. Load( j, k, f ) - veličina opterećenje tipa k u čvoru j na fideru f , Ckvar ( j, k, f ) - cena neisporučene električne energije (ENS) za opterećenje tipa k u čvoru j na fideru f , APU (i, f ) - intenzitet prolaznih otkaza (kvarova) grane i na fideru j koji dovode do kratkotrajnih prekida (APU) [broj prolaznih kvarova/god./ km]; kod TS ovaj parametar je dat kao [broj prolaznih kvarova/god.],. Desetim i jedanaestim članom su opisani investicioni i trošak održavanja za indikatore prolaska struje kvara sa daljinskom dojavom i dodatna korisnost vezana za svaki daljinski indikator, respektivno. Investicioni trošak i trošak održavanja za lokalne indikatore prolaska struje kvara je dat dvanaestim članom dok je eventualna dodatna korisnost vezana za svaki lokalni indikator obuhvaćena trinaestim članom u (1)

CC APU DG
Vreme i cene manipulacija
SUMMARY
Full Text