Abstract
The ESTU began operation in 1988 and achieved the design voltage of 20 MV in 1990. Since that time, improvements to the gas handling system, negative ion injector, accelerator terminal and control system have greatly increased its capability and reliability. Today, the ESTU can efficiently produce an extensive assortment of stable ions at wide-ranging energies in support of low-energy nuclear physics.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have