Abstract

The ESTU began operation in 1988 and achieved the design voltage of 20 MV in 1990. Since that time, improvements to the gas handling system, negative ion injector, accelerator terminal and control system have greatly increased its capability and reliability. Today, the ESTU can efficiently produce an extensive assortment of stable ions at wide-ranging energies in support of low-energy nuclear physics.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call