Abstract
In an offshore wind farm (OWF), the turbines are connected to a transformer by cable routes that cannot cross each other. Finding the minimum cost array cable layout thus amounts to a vehicle routing problem with the additional constraints that the routes must be embedded in the plane. For this problem, both exact and heuristic methods are of interest. We optimize cable layouts for real-world OWFs by a hop-indexed integer programming formulation, and develop a heuristic for computing layouts based on the Clarke and Wright savings heuristic for vehicle routing. Our heuristic computes layouts on average only 2% more expensive than the optimal layout. Finally, we present two problem extensions arising from real-world OWF cable layouts, and adapt the integer programming formulation to one of them. The thus obtained optimal layouts are up to 13% cheaper than the actually installed layouts.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.