Abstract

By using ABAQUS software to conduct numerical simulation and model test of pile-bucket under mono-loading of up-pulling force and horizontal force, then make comparison of both results to testify the accuracy of finite calculation model. Then by numerical simulation to study bearing capacity of pile-bucket foundation under combined loading of up-pull and horizontal force. The result shows the pile-bucket foundation horizontal displacement will increase with the increase of up-pulling force at the limit horizontal load, and the horizontal displacement becomes more obvious as the up-pulling load increasing if providing greater horizontal loading force. Before the up-pulling force reaches the limit, horizontal load will not affect up-pulling displacement; after the up-pulling force reaches the limit, the horizontal load can slightly reduce the up-pulling displacement of pile top. The effect of up-pulling load increase on horizontal displacement is obvious for pile depth in soil at 0~15m, but very tiny for pile body with buried depth over 15m.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.