Abstract

The massive blackout of November 9-10 has triggered some prompt and expeditious action, spearheaded by the Federal Power Commission's list of 19 affirmative recommendations that should be implemented by the utilities to preclude the possibility of a recurrence. These proposals include the need for fully coordinated power pools, more extensive stability studies for the operation of interconnected systems, the need for mixed generation facilities for quicker response to power swings, and a review of the adequacy of existing automated equipment.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.