Abstract

Abstract VERA has been operated for 12 years with one 40-cathode SNICS ion source. Since the number of isotopes investigated at VERA increased steadily, we decided to install a second ion source. Due to space restrictions, a new injection line had to be built and merged into the existing one. The major task was to build an electrostatic analyzer assembly to accommodate injection from two ion sources.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.