Abstract

The status of the project of the DC-280 cyclotron is presented. The DC-280 will be the basic facility of the Super Heavy Element Factory which is being created at the FLNR JINR. The energy of the ions extracted from the cyclotron will be vary from 4 up to 8 MeV/amu. The expected ion beam intensity at DC-280 extraction is 10 pμA for ions with masses of 50–60. The main parts of the DC-280 are already made and are being assembled. In according to FLNR plans the cyclotron has to be assembled in the period from 2016 to 2017. The cyclotron commissioning will be in 2018.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.